Home >> Project

Dongguang Xinpu Paper Co., Ltd

Mar. 24, 2019

Company background : 

                                     - Founded in January 2011 , registered in Dongguang and Hongkong .

                                     - Two corrugated board production line : 2.5 meters and 2.8 meters .

Before our project : 

                                     - Directly clampe the original paper to frame rail by car on the corrugated board prodution line , the vehicle loss is high .

                                     - The base paper rolls on the track cause high breakage rate .

                                     - The car can go directly into the workshop , there is hidden safety problem of the tile operator .

                                     - The finished cardboard warehouse is operated by manual forklift cause the turnover rate is low .

                                     - The cardboard are easily damaged when it is dragged , and the loading efficiency is low .

                                     - The forklift shuttles back and forth in the workshop , hidden dangers in the safety of the operators .

Implementation plan :

                                    - Installed with raw paper conveying logistics on the corrugated board production .

                                    - Installed whole plant intelligent cardboard logistics on finished product warehouse .

Implementation effect : 

                                    - The 2.8 meter width corrugated board production line adopts a full turntable raw paper logistics to realize


                                       the full-automatic paper-feeding function ; the intelligence level is improved and the labor intensity of the

                                       operator is greatly reduced .

                                   - The paper feeding loss is reduced by 20% , the damage loss of the base paper during transportation is reduced by 90% .

                                   - The paper conveys the car away from the operation area of the production line , the safety problems of the production


                                      line operators are solved .

                                   - The utilization rate of the finished product warehouse is improved , and the finished product is placed in the warehouse 


                                      position in accordance with the requirements for corrugated cardboard storage .

                                   - The finished product loading efficiency is increased by 30% .

                                   - The forklift did not enter the workshop again , the safety problem was solved .